S13 Oil Immersed Power Transformers 3 Phase Step up Fully Sealed Distribution Transformer

Product Details
Customization: Available
Application: Power, Electronic
Phase: Three
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Importers and Exporters
The supplier has import and export rights
Self-branded
The supplier has 2 Self-brands, check the Audit Report for more information
Patents Awarded
The supplier had awarded 6 patents, you can check the Audit Report for more information
to see all verified strength labels (27)
  • S13 Oil Immersed Power Transformers 3 Phase Step up Fully Sealed Distribution Transformer
  • S13 Oil Immersed Power Transformers 3 Phase Step up Fully Sealed Distribution Transformer
  • S13 Oil Immersed Power Transformers 3 Phase Step up Fully Sealed Distribution Transformer
  • S13 Oil Immersed Power Transformers 3 Phase Step up Fully Sealed Distribution Transformer
  • S13 Oil Immersed Power Transformers 3 Phase Step up Fully Sealed Distribution Transformer
  • S13 Oil Immersed Power Transformers 3 Phase Step up Fully Sealed Distribution Transformer
Find Similar Products

Basic Info.

Model NO.
S13
Core
Core-type Transformer
Cooling Method
Oil-immersed Type Transformer
Winding Type
Two-winding Transformer
Certification
ISO9001-2000, ISO9001, CCC
Usage
Combined Transformer, Power Transformer
Frequency Characteristics
Power Frequency
Shape of Core
Ring
Brand
Chenghe
Frequency
50Hz
Moisture-Proof Method
Sealed
Structure
Vertical
Product Feature
New
Transport Package
Plywood
Specification
30-2500kVA
Trademark
Chenghe
Origin
Wenzhou China
HS Code
8504210000
Production Capacity
1000pieces/Year

Product Description

Product Description
S13-M series fully sealed oil-immersed transformer is suitable for dry AC 50Hz, rated working S9 series product structure design based on development. The leading idea of the design is to meet the production voltage of 20kV and below the power system, as the reliability of petroleum, metallurgy, chemical, textile, light industry, improve the performance of the product, according to the actual situation of the new S9 products, and other enterprises and dust places of distribution transformers. Readjust some loss coefficients and structures, so that the loss design value is more in line with the real side value, and SO-M series fully sealed oil-immersed transformer is a new national science and technology product, in the new type of optimization design, reasonable determination of copper-iron ratio, so that the material cost is low, the structure is reasonable.

Main feature
1. Energy saving: no-load loss reduced by 40% -50%, load loss reduced by 7% -10%;
2. Reduce line loss: no-load current reduction of more than 90%;
3. Ultra-quiet: noise reduction of 10-15 dB;
4. No interference: leakage of magnetic reduction of more than 50%;
5. Save raw materials: copper and iron costs by 20% -30%;
6. Significant economic benefits: Ten years of substation costs than the new S9 down 17.2%

Structural features
1.S13-M- transformer core: the use of material properties of not less than 30ZH120 cold-rolled silicon steel; three-phase three-column three-dimensional
symmetrical structure of the most balanced three-phase magnetic circuit; each group (volume) In dedicated iron Heart winding machine on the system, the pressure
evenly compact; core frame by vacuum annealing treatment to eliminate stress, improve electromagnetic performance; core surface coated with epoxy paint, moisture,
curing.
2.S13-M- transformer windings: the use of low-oxygen copper material paper drum flat wire or QQ-2 acetal enamelled round copper wire; low voltage coil for the
double or four round copper or new spiral, Or foil. High voltage line Ring for the multi-layer cylinder; coil oil for the corrugated structure, interlayer insulation for the
double-sided adhesive tape; low pressure and high pressure surface are added around the epoxy resin semi-viscous fiberglass belt, increase the mechanical strength.
3.S13-M- transformer body, leads: the use of insulating cardboard made of upper and lower iron yoke insulation; the use of laminated wood production balance pad
insulation; the use of laminated cardboard for the lead bracket; all fasteners are Effective locking nuts.
4.S13-M- transformer oil tank: the use of triangular structure of the whole sealed corrugated fuel tank, three-phase are set to provide heat dissipation and
compensation with the oil temperature changes caused by changes in the volume of oil volume expansion; The oil level gauge with pressure relief valve on the cover is
easy to refuel and observe the oil level, and the pressure protection is safe when the internal fault of the transformer is overvoltage.

Executive standard
1. IEC60076-1:1993 Power transformer
2. GB1094.1-1996 Power transformer
3. GB6451-2008 oil-immersed power transformer technical parameters and requirements
4. JB / T10088-2004 6KV ~ 500KV class power transformer sound level
 

Main technical parameters

S13 Oil Immersed Power Transformers 3 Phase Step up Fully Sealed Distribution TransformerNote:
For rated capacity for 500 kVA and below transformers,above the diagonal values of loss of load application in Dyn11 connection group,below the diagonal load loss value appliacble to Yyn0 connected node.

Detail Photos
S13 Oil Immersed Power Transformers 3 Phase Step up Fully Sealed Distribution Transformer
S13 Oil Immersed Power Transformers 3 Phase Step up Fully Sealed Distribution Transformer
S13 Oil Immersed Power Transformers 3 Phase Step up Fully Sealed Distribution Transformer
S13 Oil Immersed Power Transformers 3 Phase Step up Fully Sealed Distribution Transformer
S13 Oil Immersed Power Transformers 3 Phase Step up Fully Sealed Distribution Transformer
S13 Oil Immersed Power Transformers 3 Phase Step up Fully Sealed Distribution Transformer


Packaging & Shipping
S13 Oil Immersed Power Transformers 3 Phase Step up Fully Sealed Distribution Transformer
S13 Oil Immersed Power Transformers 3 Phase Step up Fully Sealed Distribution Transformer
S13 Oil Immersed Power Transformers 3 Phase Step up Fully Sealed Distribution Transformer

Company Profile
Chenghe Eletric Power Technology Group CO., lTD. is a professional modern high-tech enterprise integrating R&D and manufacturing. The company was founded in 2016, with registered capital of 60 million, total assets of 120 million, with leading trancformer manufacturing technology and rich operating experience. All the products of the company have passed the certification of National Transformr Quality Supervision and Inspection Centre. In the spirit of  'Good is like water, Vitue carries things', and with the concept of harmony and innovation, Chenghe will meet the opportunities and chanllenges of the times with a new outlook! Chenghe will continue to improve and constantly transcend, with high quality products and services, and the majority of  partners sincerely hand in hand, common development! Chenghe Electric is devoting to provide high-quality power for customers. Let us cooperate with a brighter future.
S13 Oil Immersed Power Transformers 3 Phase Step up Fully Sealed Distribution Transformer

Factory Environment
S13 Oil Immersed Power Transformers 3 Phase Step up Fully Sealed Distribution Transformer
S13 Oil Immersed Power Transformers 3 Phase Step up Fully Sealed Distribution Transformer
S13 Oil Immersed Power Transformers 3 Phase Step up Fully Sealed Distribution Transformer
S13 Oil Immersed Power Transformers 3 Phase Step up Fully Sealed Distribution Transformer


Certificates
S13 Oil Immersed Power Transformers 3 Phase Step up Fully Sealed Distribution Transformer
S13 Oil Immersed Power Transformers 3 Phase Step up Fully Sealed Distribution Transformer
S13 Oil Immersed Power Transformers 3 Phase Step up Fully Sealed Distribution Transformer

FAQ
Q: Are you a Manufacturer, factory or Trading company?   
A: Yes, we are engaging over 20years in the research and development, production and operation of distribution equipment (transformer, switchgear, substation, etc.).

Q: What's your warranty terms?
A: We offer 24 months warranty time.

Q: How long is the production time?
A: 25 to 45 days or depending on order requirements.

Q: What's your payment terms?
A: T/T, L/C or negotiation.

Q: How do you conduct quality control in your factory?
A: We implement incoming inspection for raw material, in process inspection during production and 100% OQC inspection before delivery to ensure every product is qualified.


Q: Do you have the products in stock?
A: Normally no, but we have raw material stock to shorten production lead time.


Q: How can I trust you?
A: Chenghe Electric has more than 20years manufacturing experience, and cooperated with many customers all over the world. We have many patent certificates, CE certificate, ISO9001, ISO14000 certificate. We are the audited supplier of Made-In-China.


Q: What should provide to make custom transformer?
A: Technical drawing and specification documents are the best, or you can list key parameters for designing.


Q: Could I have your catalog and price list?
A: Price may change based on material market. Welcome to contact for accurate price via Made-in-China or company official website.

 